Building and renovation
Drawing an entry for an architecture competition
A competition entry has a fixed deadline, a strict list of required drawings, and a brief that can change while the team is still drawing. This project holds the site photos, the study models, each drawing on a board, three to-do lists and the review dates.

Solheim Wiebe Architects posts the brief, the site notes and each addendum on the and keeps the sheets, the models and the entry rules as three lists in To-dos, each a dot on the progress chart. Site walk photos and study models sit in two Docs & Files grids, each drawing moves from sketch to done on Boards, and the Calendar holds the reviews and the day entries close.
In this project
The tools on the project's page, in the order shown above, and what each one holds.
6 posts, the newest “The 1:200 site model has its bank”
To-dos
Sheets (2 of 7 done), Site and cabin models (3 of 6 done) and Entry rules (3 of 6 done)
Docs & FilesSite walk
9 pictures
BoardsDrawings
16 cards in Triage, Sketch, CAD, Renders, Pinned up and Done
Docs & FilesStudy models
9 pictures
Calendar
7 events, the next “Deck and skids check with Reynaldo”
More in Building and renovation

Kitchen renovation
A kitchen renovation runs on dozens of choices, deliveries and inspections, often while a family still lives in the house. Here the job is one project: site photos, finish samples, materials on order, plans and permits, the site schedule and the crew's end-of-day notes.

Custom home design
A custom home is built from an architect's drawings over many months, and the builder's questions and the owners' choices come up at each stage. Here the house is one project: site visit photos, material samples, the builder's questions on a board, open to-dos and inspection dates.

Hotel renovation
A hotel renovation has to finish every room, pass its inspections and hire its staff before the first guests can check in. This project holds a card for each of the 24 rooms, photos of finished rooms and the courtyard, four to-do lists and the crew's chat.
Start your own project
Create an account and start a project. Every project comes with a Message Board, To-dos, Docs & Files, a Calendar, Boards and Chat, on every plan, Free included.