Building and renovation

Taking a solar array from racking to power-on

A solar installation needs a crew on the roof, an electrician at the switchgear and sign-off from the city and the utility, while the building stays open. Here the install is one project: the crew's daily log, deliveries on a board, site photos and the inspection dates.

The Vine Drive Warehouse Solar project in Thicket over a picture of a solar array on a flat warehouse roof with foothills beyond: the health flag reading On track, the install dates and four people, then six cards: the Message Board with tie-in night on top, To-dos with four lists on the progress chart, Site photos as nine pictures of the roof, the parking lot piers and the electrical room, the Deliveries board with the canopy steel on hold, Check-ins with the crew's answers about the day's work, and the Calendar with the city inspection, tie-in night and the crane.

Bluestem Solar posts the install plan and each milestone on the Message Board, and the crew answers a daily question in Check-ins about what it finished on the roof. Four lists in To-dos sit on the progress chart, and panels, inverters and canopy steel move from ordered to installed on Boards. Site photos fill a Docs & Files grid, and the inspections, tie-in night and the crane are on the Calendar.

In this project

The tools on the project's page, in the order shown above, and what each one holds.

  • Message Board

    5 posts, the newest “Tie-in night: what the warehouse needs to do”

  • To-dos

    4 lists, 12 of 30 to-dos done: Canopies, Inspections and utility, Electrical and tie-in and 1 more

  • Docs & FilesSite photos

    9 pictures

  • BoardsDeliveries

    14 cards in Triage, Ordered, Fabricating, Shipped, On site and Done

  • Check-ins

    Asks “What did the crew finish today?”

  • Calendar

    7 events, the next “City electrical inspection: roof”

Start your own project

Create an account and start a project. Every project comes with a Message Board, To-dos, Docs & Files, a Calendar, Boards and Chat, on every plan, Free included.

Try Thicket Free

Free plan or a 30-day Pro trial. No card required.

See all example projects