Building and renovation
Repairing a bridge and reopening the crossing
A bridge repair closes a crossing that people use every day, and the work waits on stone deliveries, inspections and the weather. Here the repair is one project: bridge and stone yard photos, a board for every new stone, the inspection dates and the masons' daily crack readings.

Larkin Stoneworks posts each find and decision on the and splits the repair into four lists in To-dos, three of them on the progress chart. Photos from the bridge and the stone yard sit in two Docs & Files grids beside the permits and letters, every new stone moves from template to set on Boards, and the Calendar holds the deliveries and inspections. Each afternoon a mason answers one question in Check-ins: what the three crack gauges on the arch read.
In this project
The tools on the project's page, in the order shown above, and what each one holds.
5 posts, the newest “The new arch stones are late”
To-dos
4 lists, 8 of 25 to-dos done: Arch and walls, Drainage and path, Railings and 1 more
Docs & FilesOn the bridge
9 pictures
CalendarDeliveries and inspections
7 events, the next “Membrane delivery”
BoardsStone schedule
13 cards in Triage, To template, At the quarry, Dressing in the yard, Ready to set and Done
Docs & FilesStone yard
9 pictures
Check-insCrack gauges
Asks “What do the crack gauges on the arch read today?”
Docs & FilesPermits and letters
condition-survey-report.pdf, Permits (3 items), Mortar analysis, bat-survey-upstream-face.pdf, Neighbors' site walk invitation, Answers for park users and 1 more
More in Building and renovation

Kitchen renovation
A kitchen renovation runs on dozens of choices, deliveries and inspections, often while a family still lives in the house. Here the job is one project: site photos, finish samples, materials on order, plans and permits, the site schedule and the crew's end-of-day notes.

Custom home design
A custom home is built from an architect's drawings over many months, and the builder's questions and the owners' choices come up at each stage. Here the house is one project: site visit photos, material samples, the builder's questions on a board, open to-dos and inspection dates.

Architecture competition
A competition entry has a fixed deadline, a strict list of required drawings, and a brief that can change while the team is still drawing. This project holds the site photos, the study models, each drawing on a board, three to-do lists and the review dates.
Start your own project
Create an account and start a project. Every project comes with a Message Board, To-dos, Docs & Files, a Calendar, Boards and Chat, on every plan, Free included.