A camping trip for several families means booking a site, planning every meal and deciding who brings each piece of shared gear. Here the trip is one project: the bookings, a board of shared gear, lists for food and the night sky, the calendar and site photos.

The Meteor Shower at Coyote Bench project in Thicket over a photograph of a red rock desert at dusk with the first stars: the health flag reading At risk, the trip dates and eight people, then nine cards: the Message Board with the cloud forecast for peak night on top, The site as nine photographs of the desert campsite, Trip lists with three lists on the progress chart, the Shared gear board with cards in Need, Borrowing and Bringing, Chat about propane and the meteor watch, Camp kitchen as nine photographs of the menu's test runs, the Calendar with the gear check and peak night, Trip docs with the trip plan, the star charts and the tent plan, and Bookings with the park's rules for fires, firewood and lights, with three external links below.

The Rahimi, Castellanos and Brekke families plan their meteor shower trip on the Message Board, from the site booking to what to pack for cold nights. Photos of the site and of the menu's test runs sit in two Docs & Files grids beside the trip plan and the park's rules, each piece of shared gear moves from Need to Borrowing or Bringing on Boards, and three lists in To-dos cover the errands, the food and the night sky. The Calendar holds the gear check and peak night, and the families settle smaller questions in Chat, like who has the third propane bottle.

In this project

The tools on the project's page, in the order shown above, and what each one holds.

  • Message Board

    5 posts, the newest “High cloud on peak night?”

  • Docs & FilesThe site

    9 pictures

  • To-dosTrip lists

    Before we go (4 of 8 done), Food (2 of 7 done) and Night sky (2 of 7 done)

  • BoardsShared gear

    13 cards in Triage, Need, Borrowing, Bringing and Done

  • Chat

    7 lines from 7 people

  • Docs & FilesCamp kitchen

    9 pictures

  • Calendar

    8 events, the next “Gear check at the Brekkes'”

  • Docs & FilesTrip docs

    Trail maps (3 items), Menu and grocery split, Tents and sleeping spots, meteor-shower-star-charts-3-nights.pdf and Trip plan and directions

  • Docs & FilesBookings

    group-site-c-confirmation.pdf, Ranger star party: 11 seats, Quiet hours and lights at the pad, Firewood: buy it at the visitor center and Wind rule for fires and coals

Start your own project

Create an account and start a project. Every project comes with a Message Board, To-dos, Docs & Files, a Calendar, Boards and Chat, on every plan, Free included.

Try Thicket Free

Free plan or a 30-day Pro trial. No card required.

See all example projects