Marketing and creative work

Taking a new dance from studio to stage

A dance premiere has one opening night, and the music, costumes, shoes, floor and lighting all have to be ready for it. Here the premiere is one project: studio and costume shop photos, the costume board, the rehearsal calendar and lists for music, costumes, light and opening night.

The Bajo Tierra Premiere project in Thicket over a photograph of an empty rehearsal studio in late afternoon light: the health flag reading On track, the premiere's dates and six people, then six cards: the Message Board with the first run on the new floor on top, To-dos with four lists, three of them on the progress chart, In the studio as nine photographs of the company rehearsing, the Costume build board with cards in To cut, Sewing and Fitting, Costume shop as nine photographs of the costumes being made, and Rehearsals and tech with the run with the musicians and the shoes arriving from Seville.

Alcalá Flamenco posts each change to the piece on the Message Board and keeps the music, the costumes and shoes, the floor and lights, and opening night as four lists in To-dos, three of them on the progress chart. Rehearsal and costume shop photos sit in two Docs & Files grids, every costume moves from cutting to done on Boards, and the Calendar holds the runs, the costume parade, tech week and both performances.

In this project

The tools on the project's page, in the order shown above, and what each one holds.

  • Message Board

    5 posts, the newest “First run on the new floor: 76 minutes”

  • To-dos

    4 lists, 9 of 23 to-dos done: Music, Costumes and shoes, Floor, light and sound and 1 more

  • Docs & FilesIn the studio

    9 pictures

  • BoardsCostume build

    13 cards in Triage, To cut, Sewing, Fitting, Finishing and Done

  • Docs & FilesCostume shop

    9 pictures

  • CalendarRehearsals and tech

    8 events, the next “Run with the musicians, in jackets”

Start your own project

Create an account and start a project. Every project comes with a Message Board, To-dos, Docs & Files, a Calendar, Boards and Chat, on every plan, Free included.

Try Thicket Free

Free plan or a 30-day Pro trial. No card required.

See all example projects