Client work moves in rounds: the studio shows a draft, the client asks for changes, and the next round starts from what was approved. Here one client's job is one project: the client's notes, a to-do list per film, the approved cuts and photos of the sets.

The Brookvale Transit explainers project in Thicket over a photograph of shelves of colored paper: the health flag reading On track, the project dates and six people, then six cards: the Message Board with the delayed accessibility review on top, To-dos with four film lists on the progress chart, Paper sets as nine photographs of the cut-paper bus and its riders on the camera table, Ride-along as nine photographs of the client's buses and stops, Docs & Files with the questions for the accessibility group, the approved cuts and the episode 4 storyboard, and Chat with the morning's lines about the cyclist shot.

Inkline Studio posts the plan and each round of Brookvale Regional Transit's notes on the Message Board and keeps the films in progress as four lists in To-dos, each a dot on the progress chart. Photos of the paper sets and of the client's buses fill two Docs & Files grids, the scripts and approved cuts sit in a third Docs & Files, and the animators talk through the day's shooting in Chat.

In this project

The tools on the project's page, in the order shown above, and what each one holds.

  • Message Board

    5 posts, the newest “Film 4 waits for the accessibility review”

  • To-dos

    4 lists, 11 of 21 to-dos done: Film 3: Bikes on board, Film 4: Ramps and priority seats, Film 5: Night buses and 1 more

  • Docs & FilesPaper sets

    9 pictures

  • Docs & FilesRide-along

    9 pictures

  • Docs & FilesScripts and cuts

    tamarack-statement-of-work-signed.pdf, Series style guide, Episode schedule, Scripts (6 items), Narration (6 items), film4-storyboard-24-panels.pdf and 2 more

  • Chat

    8 lines from 6 people

Start your own project

Create an account and start a project. Every project comes with a Message Board, To-dos, Docs & Files, a Calendar, Boards and Chat, on every plan, Free included.

Try Thicket Free

Free plan or a 30-day Pro trial. No card required.

See all example projects