Marketing and creative work

Updating a brand's lettering, colors and signs

A brand refresh puts one new design on a sign, bags, shelf tags and a website, each with its own maker's proofs. Here the refresh is one project: artwork moving through review on a board, sample photos, suppliers' news, and to-do lists for each piece.

The New Sign and Colors project in Thicket over a picture of an old hardware store's wall of oak drawers: the health flag reading On track, the project dates and six people, then eight cards: the Signs and print board with cards in Sketches, Family review, Revisions and At the printer, To-dos with four lists on the progress chart and the storefront's open to-dos, Samples as nine photographs of the new paper bags, enamel sign and color swatches, Decisions with the new sign day plan on top, The old store as nine photographs of the shop's drawers, counter and tin ceiling, Final files with the guide to writing signs and tags, the bag artwork and the shelf tag list, Chat with the latest lines from the store, and Suppliers with news from the embroidery shop, the bag printer, the label printer and the sign maker, and six External links.

Pappas Hardware, a family hardware store, records each decision on one Message Board and keeps its suppliers' news on a second. Every sign and printed piece moves from sketches to done on Boards, To-dos track the storefront, the bags, the website and the lettering on the progress chart, and Docs & Files holds the samples, photographs of the old store and the final files. Quick questions go in Chat.

In this project

The tools on the project's page, in the order shown above, and what each one holds.

  • BoardsSigns and print

    16 cards in Triage, Sketches, Family review, Revisions, At the printer and Done

  • To-dos

    4 lists, 10 of 23 to-dos done: Storefront, Bags and print, Website and 1 more

  • Docs & FilesSamples

    9 pictures

  • Message BoardDecisions

    5 posts, the newest “New sign day”

  • Docs & FilesThe old store

    9 pictures

  • Docs & FilesFinal files

    Wordmark (4 items), Color guide, Sign patterns (4 items), Shelf tag product list, Bag artwork (3 items) and How we write signs and tags

  • Chat

    5 lines from 5 people

  • Message BoardSuppliers

    4 posts, the newest “Main Line Embroidery: apron quote”

Start your own project

Create an account and start a project. Every project comes with a Message Board, To-dos, Docs & Files, a Calendar, Boards and Chat, on every plan, Free included.

Try Thicket Free

Free plan or a 30-day Pro trial. No card required.