Building and renovation
Building a network of fast chargers for electric cars
A charging network is several small construction jobs in towns miles apart, each waiting on its own trench, power hookup and inspection. Here the rollout is one project: a card per site on a board, the line crew's photos, the permit letters and site to-do lists.

Shoal Fork Electric Cooperative moves each of its eight charging sites from civil work to live on Boards and posts the news from its sites on the . Three sites have their own lists in To-dos, on the progress chart. The line crew's photos and the letters from the state and the county sit in Docs & Files, and the inspections, a planned outage and the ribbon cuttings are on the Calendar.
In this project
The tools on the project's page, in the order shown above, and what each one holds.
5 posts, the newest “Arbor Hill is energized”
To-dos
4 lists, 12 of 31 to-dos done: Site 6: Coldwater, Site 7: Marrow Lake marina, Site 5: Arbor Hill library and 1 more
Docs & FilesBuild photos
9 pictures
BoardsSites
10 cards in Triage, Civil and service, Charger install, Commissioning and Done
Calendar
8 events, the next “Commission Arbor Hill with the maker's technician”
Docs & FilesLetters and permits
state-charging-grant-award.pdf, Host agreements (4 items), One-line drawings (3 items), rate-card-34-cents.pdf, Charger firmware 3.2 for all 16 dispensers, County inspection booked: Dunmore and 1 more
More in Building and renovation

Kitchen renovation
A kitchen renovation runs on dozens of choices, deliveries and inspections, often while a family still lives in the house. Here the job is one project: site photos, finish samples, materials on order, plans and permits, the site schedule and the crew's end-of-day notes.

Custom home design
A custom home is built from an architect's drawings over many months, and the builder's questions and the owners' choices come up at each stage. Here the house is one project: site visit photos, material samples, the builder's questions on a board, open to-dos and inspection dates.

Architecture competition
A competition entry has a fixed deadline, a strict list of required drawings, and a brief that can change while the team is still drawing. This project holds the site photos, the study models, each drawing on a board, three to-do lists and the review dates.
Start your own project
Create an account and start a project. Every project comes with a Message Board, To-dos, Docs & Files, a Calendar, Boards and Chat, on every plan, Free included.