A charging network is several small construction jobs in towns miles apart, each waiting on its own trench, power hookup and inspection. Here the rollout is one project: a card per site on a board, the line crew's photos, the permit letters and site to-do lists.

The Fast Chargers in Eight Towns project in Thicket over a photograph of a country road and power lines through wooded hills at dusk: the health flag reading At risk, the project dates and five people, then six cards: the Message Board with Arbor Hill's energized post on top, To-dos with three site lists on the progress chart, Build photos as nine pictures of trenches, a transformer and finished chargers, the Sites board with cards in Civil and service, Charger install, Commissioning and Done, the Calendar with Arbor Hill's commissioning and the state's soil sampling, and Letters and permits with the state's sampling notice, the county inspection and the charger firmware notice.

Shoal Fork Electric Cooperative moves each of its eight charging sites from civil work to live on Boards and posts the news from its sites on the Message Board. Three sites have their own lists in To-dos, on the progress chart. The line crew's photos and the letters from the state and the county sit in Docs & Files, and the inspections, a planned outage and the ribbon cuttings are on the Calendar.

In this project

The tools on the project's page, in the order shown above, and what each one holds.

  • Message Board

    5 posts, the newest “Arbor Hill is energized”

  • To-dos

    4 lists, 12 of 31 to-dos done: Site 6: Coldwater, Site 7: Marrow Lake marina, Site 5: Arbor Hill library and 1 more

  • Docs & FilesBuild photos

    9 pictures

  • BoardsSites

    10 cards in Triage, Civil and service, Charger install, Commissioning and Done

  • Calendar

    8 events, the next “Commission Arbor Hill with the maker's technician”

  • Docs & FilesLetters and permits

    state-charging-grant-award.pdf, Host agreements (4 items), One-line drawings (3 items), rate-card-34-cents.pdf, Charger firmware 3.2 for all 16 dispensers, County inspection booked: Dunmore and 1 more

Start your own project

Create an account and start a project. Every project comes with a Message Board, To-dos, Docs & Files, a Calendar, Boards and Chat, on every plan, Free included.

Try Thicket Free

Free plan. No card required. Includes a 30-day Pro trial.

See all example projects