Operations and infrastructure
Getting a new air route ready for its first flight
A new air route opens on a fixed date, and the station, the staff and the aircraft must be ready before the first passenger boards. Here the route is one project: station equipment on a board, terminal and test flight photos, the schedule and the staff's weekly check-ins.

Kittiwake Air tracks the equipment for its three docks on Boards and keeps photos of its new float terminal and its island test flights in Docs & Files, beside the landing notes and the timetable. The carries the schedule, the fares and the late float, To-dos hold the terminal, island and fleet lists, and the station staff answer a weekly question in Check-ins. Pilots and agents talk through each morning in Chat, and the dress rehearsal and the first flight are on the Calendar.
In this project
The tools on the project's page, in the order shown above, and what each one holds.
5 posts, the newest “The Sorrel Island float is nine days late”
To-dos
4 lists, 14 of 32 to-dos done: Island docks, Harbor terminal, Fleet and pilots and 1 more
BoardsThree docks
14 cards in Triage, Ordered, Building, Inspecting and Done
Docs & FilesFloat terminal
9 pictures
Docs & FilesIsland test flights
9 pictures
ChatDock talk
6 lines from 6 people
Check-ins
Asks “What's left on your side before the first flight?”
Calendar
7 events, the next “Scale certification on the float”
Docs & FilesRoute papers
Harbor and island approvals (3 items), Landing notes: Quill and Sorrel, Weighing passengers: what agents say, timetable-v4.pdf and sorrel-float-drawings-rev-c.pdf
More in Operations and infrastructure

Business expansion
Taking on more space means building work, new equipment and an opening date, all while the business stays open. Here the expansion is one project: the building work, the new rooms and the lease, deliveries and inspections, and photos of the new space.

Office move
An office move happens over one weekend, and every desk, computer and box must be packed before it and working after it. Here the move is one project: lists for move weekend, the build-out and IT, photos of the new building, and the books on a board.

Warehouse software rollout
A warehouse has to keep shipping while each shift learns new handhelds, labels and screens, one area at a time. Here the rollout is one project: the cutover checklists, each area's progress on a board, the vendor's mail, floor photos and the supervisors' end-of-shift answers.
Start your own project
Create an account and start a project. Every project comes with a Message Board, To-dos, Docs & Files, a Calendar, Boards and Chat, on every plan, Free included.