A bike launch needs frames built and tested, photographs taken and demo bikes in shops, all before the day orders open. This project holds production, the shop program and launch day as three lists, photos from the frame shop and the test rides, and the build dates.

The Moraine Launch project in Thicket over a photograph of cured bamboo poles stacked on a workshop rack: the health flag reading At risk, the launch dates and five people, then six cards: the Message Board with the thin bamboo lot on top, Frame shop as nine photographs of bamboo bike frames being built, To-dos with three lists on the progress chart, the Calendar with batch 4's wrap day, Test rides as nine photographs of the bamboo bike on gravel roads through pine forest, and Chat with the day's builds, then External links to the geometry, the shop orders and the preorder page.

Culm Bicycle Works posts each batch's news and the bamboo shortage that delays its last batch on the Message Board and keeps production, the 12 shops and launch day as three lists in To-dos, each a dot on the progress chart. Photos from the frame shop and the test rides fill two Docs & Files grids, the wrap days and launch day are on the Calendar, and the shop talks through each day's builds in Chat.

In this project

The tools on the project's page, in the order shown above, and what each one holds.

  • Message Board

    5 posts, the newest “26 culms in the new lot are too thin”

  • Docs & FilesFrame shop

    9 pictures

  • To-dos

    Production (4 of 9 done), Shops (2 of 6 done) and Launch day (2 of 7 done)

  • Calendar

    6 events, the next “Batch 4 wrap day”

  • Docs & FilesTest rides

    9 pictures

  • ChatShop floor

    6 lines from 5 people

Start your own project

Create an account and start a project. Every project comes with a Message Board, To-dos, Docs & Files, a Calendar, Boards and Chat, on every plan, Free included.

Try Thicket Free

Free plan or a 30-day Pro trial. No card required.

See all example projects