Products and software

Spinning, knitting and selling a sweater collection

A knitwear collection depends on yarn, samples and knitters, and one short lot of yarn can delay every sweater of one design. This project holds yarn, pattern and launch lists, each knitter's sweaters on a board, photos of the mill and the lookbook shoot, and the pickup dates.

The Fisherman Sweater Collection project in Thicket over a photograph of red ochre fishing sheds along a quiet northern harbor: the health flag reading On track, the collection dates and five people, then six cards: the Message Board with the short brown yarn on top, Mill floor as nine photographs of the mill's machines and yarn, To-dos with three lists on the progress chart, the Knitters board with cards in Kit ready, On the needles and Blocking and checking, Wharf shoot as nine photographs of the sweaters worn on a fishing wharf, and the Calendar with the next kit pickup, then External links to the patterns, the knitters' kits and the line sheet.

Tolt Fibre Mill posts dye results, shop orders and the short lot of brown yarn on the Message Board and keeps yarn, patterns and the launch as three lists in To-dos on the progress chart. Each knitter's sweaters move from kit to finished on Boards, photos of the mill and the wharf shoot fill two Docs & Files grids, and the kit pickups and the open house are on the Calendar.

In this project

The tools on the project's page, in the order shown above, and what each one holds.

  • Message Board

    5 posts, the newest “The moorit is 17 kg short”

  • Docs & FilesMill floor

    9 pictures

  • To-dos

    Yarn (4 of 6 done), Patterns and sizes (3 of 6 done) and Launch (1 of 7 done)

  • BoardsKnitters

    14 cards in Triage, Kit ready, On the needles, Blocking and checking and Done

  • Docs & FilesWharf shoot

    9 pictures

  • Calendar

    6 events, the next “Kit pickup at the mill: six knitters”

Start your own project

Create an account and start a project. Every project comes with a Message Board, To-dos, Docs & Files, a Calendar, Boards and Chat, on every plan, Free included.