Marketing and creative work

Recording and releasing a podcast season

A podcast season is often still being reported and edited when its first episodes come out, so each episode is at a different stage. This project holds each episode's to-dos on the progress chart, the scripts and reel log, studio and field photos, and the team's chat.

The Long Memory, Season 2 project in Thicket over a photograph of a city street of brick storefronts at blue hour: the health flag reading On track, the season dates and five people, then six cards: In the studio as nine photographs of interviews and tape in the studio, Episodes with four episode lists on the progress chart, Scripts and cue sheets with the reel log, the episode 4 outline and the trailer script, the Message Board with the visit to the old station on top, Orchard Street as nine photographs of the old station's rooms over a laundromat, and Chat with the crew recording a sign-off.

Spindle Audio tracks each episode of season 2 as a list in To-dos, each a dot on the progress chart, and keeps the scripts, cue sheets and reel log in Docs & Files. Studio sessions and the old station's rooms sit in two more Docs & Files grids, the team posts mixes and archive news on the Message Board, and the field crew reports in Chat while it records.

In this project

The tools on the project's page, in the order shown above, and what each one holds.

  • Docs & FilesIn the studio

    9 pictures

  • To-dosEpisodes

    5 lists, 11 of 29 to-dos done: Ep 3: The Overnight Line, Ep 4: The Rent Strike, Ep 5: Polka and Salsa and 2 more

  • Docs & FilesScripts and cue sheets

    Archive transfers (3 items), Scripts (3 items), Music cues (3 items), interview-releases-23-signed.pdf, Trailer script, version 3, Ep 4 outline: The Rent Strike and 1 more

  • Message Board

    5 posts, the newest “Upstairs at Orchard Street”

  • Docs & FilesOrchard Street

    9 pictures

  • Chat

    7 lines from 4 people

Start your own project

Create an account and start a project. Every project comes with a Message Board, To-dos, Docs & Files, a Calendar, Boards and Chat, on every plan, Free included.

Try Thicket Free

Free plan or a 30-day Pro trial. No card required.