Outdoors and sport
Running a sailing regatta
A regatta needs a race committee, safety boats and a launch plan for every entry, and wind or low water can change that plan. This project holds lists for the water, the shore and entries, coach boats on a board, parents' questions, tune-up photos and the committee's chat.

Sand Plum Sailing Club posts the notice of race, the entry count and the low lake news on the and answers families on a second one. To-dos hold the work on the water, ashore and for registration, tune-up photos sit in Docs & Files, visiting coach boats move across Boards, and the race committee reports the wind and the lake level in Chat.
In this project
The tools on the project's page, in the order shown above, and what each one holds.
To-dos
On the water (3 of 8 done), Ashore (1 of 7 done) and Registration (4 of 7 done)
Chat
6 lines from 5 people
Docs & FilesTune-up day
9 pictures
BoardsCoach boats
9 cards in Triage, Forms in, Insurance checked, Flag and launch time and Done
Parent questions
5 posts, the newest “What happens if the lake is too low to launch?”
5 posts, the newest “The lake is 3.6 feet low”
More in Outdoors and sport

Avalanche safety courses
An avalanche course needs enough students, two instructors and terrain the snowpack allows on the day, and each of those can change within a week. This project holds course dates and rosters, field day photos, snowpack notes and each guide's plan for the next day.

Group camping trip
A camping trip for several families means booking a site, planning every meal and deciding who brings each piece of shared gear. Here the trip is one project: the bookings, a board of shared gear, lists for food and the night sky, the calendar and site photos.

Climbing gym expansion
A climbing gym that adds a room builds it beside members still climbing, and the room must pass inspection before it opens. This project holds each order on a board, photos of the build and the light-up climbing board, three to-do lists and the opening dates.
Start your own project
Create an account and start a project. Every project comes with a Message Board, To-dos, Docs & Files, a Calendar, Boards and Chat, on every plan, Free included.