Outdoors and sport
Adding a training room to a climbing gym
A climbing gym that adds a room builds it beside members still climbing, and the room must pass inspection before it opens. This project holds each order on a board, photos of the build and the light-up climbing board, three to-do lists and the opening dates.

Sandrock Bouldering moves each part of the build from ordered to installed on Boards and photographs the bay and its new light-up climbing board in two Docs & Files grids. The training room, the youth wall and open night are three lists in To-dos, milestones and supplier news go on the , and the Calendar holds the fire marshal's walk-through and the members' open night.
In this project
The tools on the project's page, in the order shown above, and what each one holds.
BoardsBuild
16 cards in Requests, Ordered, On site, Installing and Done
Docs & FilesThe bay
9 pictures
To-dos
Open night (1 of 6 done), Youth wall (3 of 7 done) and Training room (4 of 8 done)
5 posts, the newest “The light-up board is bolted and lit”
Calendar
7 events, the next “Fire marshal's walk-through”
Docs & FilesLight-up board
9 pictures
More in Outdoors and sport

Avalanche safety courses
An avalanche course needs enough students, two instructors and terrain the snowpack allows on the day, and each of those can change within a week. This project holds course dates and rosters, field day photos, snowpack notes and each guide's plan for the next day.

Group camping trip
A camping trip for several families means booking a site, planning every meal and deciding who brings each piece of shared gear. Here the trip is one project: the bookings, a board of shared gear, lists for food and the night sky, the calendar and site photos.

Ski season opening
A ski hill can open only when the lift has passed its inspection, the runs have enough snow and the lodge and staff are ready. This project holds the lift and lodge work, snowmaking, hill and lodge photos, the dates up to opening day and a weekly check-in.
Start your own project
Create an account and start a project. Every project comes with a Message Board, To-dos, Docs & Files, a Calendar, Boards and Chat, on every plan, Free included.