Products and software

Making a glassware collection by hand

Hand-blown glass is made one piece at a time, and one bad batch of glass can put a whole order behind. This project holds photos from the hot shop and of the finished pieces, wholesale orders on a board, three to-do lists and the studio's chat.

The Table Line project in Thicket over a photograph of a glass furnace glowing in a brick hot shop: the health flag reading On track, the project dates and four people, then six cards: Hot shop as nine photographs of glassblowing at the furnace and the bench, To-dos with three lists on the progress chart, On the table as nine photographs of the carafe and tumblers in gray, blue-green and brown, the Orders board with cards from Samples out to Cold shop, Chat with the morning's furnace and annealer news, and the Message Board with the cracking Lake tumblers on top.

Second Melt Glass posts the line's plan, its three tints and the cracking Lake tumblers on the Message Board and keeps the Maumee Room's order, the glass and the web shop as three lists in To-dos. Photos from the hot shop and of the finished pieces sit in two Docs & Files grids, every wholesale order moves across Boards, and the furnace and annealer news goes in Chat.

In this project

The tools on the project's page, in the order shown above, and what each one holds.

  • Docs & FilesHot shop

    9 pictures

  • To-dos

    Maumee Room order (3 of 9 done), Glass and tints (4 of 8 done) and Web shop and open furnace night (1 of 8 done)

  • Docs & FilesOn the table

    9 pictures

  • BoardsOrders

    13 cards in Triage, Samples out, Confirmed, Blowing, Cold shop and Done

  • Chat

    6 lines from 4 people

  • Message Board

    5 posts, the newest “Lake tumblers are cracking at the base”

Start your own project

Create an account and start a project. Every project comes with a Message Board, To-dos, Docs & Files, a Calendar, Boards and Chat, on every plan, Free included.

Try Thicket Free

Free plan or a 30-day Pro trial. No card required.