Getting a ski hill ready for opening day
A ski hill can open only when the lift has passed its inspection, the runs have enough snow and the lodge and staff are ready. This project holds the lift and lodge work, snowmaking, hill and lodge photos, the dates up to opening day and a weekly check-in.

Tenmile Hill, a ski hill owned by its members, posts lift and lodge news on the and tracks the chairlift, snowmaking, the lodge and its people as four lists in To-dos. The snowmaking crew talks in Chat before dawn, every broken thing moves from found to done on Boards, and photos of the hill and the lodge sit in two Docs & Files grids beside the manuals. The Calendar holds the rope splice, the state inspection and opening day, and Check-ins ask each crew lead every week what is left.
In this project
The tools on the project's page, in the order shown above, and what each one holds.
6 posts, the newest “The haul rope needs a new splice”
To-dos
4 lists, 11 of 24 to-dos done: Chairlift, Snowmaking and grooming, Lodge and rentals and 1 more
Docs & FilesOn the hill
9 pictures
ChatHill crew
7 lines from 5 people
BoardsWork list
16 cards in Triage, Found, Waiting on parts, Being fixed, Ready for sign-off and Done
Docs & FilesLodge
9 pictures
Calendar
7 events, the next “Haul rope splice”
Check-insBefore opening day
Asks “What's left on your crew's list before opening day?”
Docs & FilesHill manual
Lift evacuation (3 items), Patrol sweep routes, rental-fleet.xlsx, rope-test-report.pdf, snowmaking-log.xlsx and Opening day run sheet
More in Outdoors and sport

Avalanche safety courses
An avalanche course needs enough students, two instructors and terrain the snowpack allows on the day, and each of those can change within a week. This project holds course dates and rosters, field day photos, snowpack notes and each guide's plan for the next day.

Group camping trip
A camping trip for several families means booking a site, planning every meal and deciding who brings each piece of shared gear. Here the trip is one project: the bookings, a board of shared gear, lists for food and the night sky, the calendar and site photos.

Climbing gym expansion
A climbing gym that adds a room builds it beside members still climbing, and the room must pass inspection before it opens. This project holds each order on a board, photos of the build and the light-up climbing board, three to-do lists and the opening dates.
Start your own project
Create an account and start a project. Every project comes with a Message Board, To-dos, Docs & Files, a Calendar, Boards and Chat, on every plan, Free included.