Marketing and creative work
Showing a new collection on the runway
A runway show brings every look, model and guest into one room for one night, and each depends on a fitting, a call time or a seat. This project holds the line-up look by look, the venue and studio photos, casting, fittings and the show calendar.

Obiora posts the plan, casting and the RSVPs on the and moves all 24 looks from pattern to done on Boards. The studio and the ferry terminal are two Docs & Files grids, the atelier, casting, the show and press are four lists in To-dos, and the Calendar holds the fittings, the lighting test and show night.
In this project
The tools on the project's page, in the order shown above, and what each one holds.
5 posts, the newest “The rust Melton came back too brown”
BoardsLine-up
26 cards in Triage, Pattern, Sample, Fitting and Done
Docs & FilesStudio
9 pictures
To-dos
4 lists, 10 of 26 to-dos done: Atelier, Casting and fittings, Show production and 1 more
Docs & FilesThe terminal
9 pictures
CalendarShow calendar
8 events, the next “First fittings: the last 8 models”
More in Marketing and creative work

Design agency client work
Client work moves in rounds: the studio shows a draft, the client asks for changes, and the next round starts from what was approved. Here one client's job is one project: the client's notes, a to-do list per film, the approved cuts and photos of the sets.

Marketing campaign
A campaign needs its photos, its store displays, its printed pieces and the product itself ready on the same day. Here the campaign is one project: the shoot photos, the display artwork on a board, to-do lists for bottling and launch week, and the print files.

Brand identity refresh
A brand refresh puts one new design on a sign, bags, shelf tags and a website, each with its own maker's proofs. Here the refresh is one project: artwork moving through review on a board, sample photos, suppliers' news, and to-do lists for each piece.
Start your own project
Create an account and start a project. Every project comes with a Message Board, To-dos, Docs & Files, a Calendar, Boards and Chat, on every plan, Free included.