Building and renovation

Building a surgery suite for horses

Building a surgery suite means installing and testing a table, lights, gas lines and padded stalls while surgeries continue in the old room. This project holds the build's news, a weekly check-in, photos of patients and the new rooms, a board of fixes and four to-do lists.

The East Wing Surgery Suite project in Thicket over a photograph of a horse pasture with live oaks at sunrise: the health flag reading On track, the build's dates and six people, then six cards: Check-ins with this week's answers about what is left, Hospital barn as nine photographs of horses in the hospital's stalls and treatment areas, the Walk-through board with fixes in Logged, Builder fixing and Ready to recheck, To-dos with four lists on the progress chart, the Message Board with the mock run on top, and The new suite as nine photographs of the surgery room and the padded recovery stalls.

Cedar Branch Equine Hospital asks everyone on the build one weekly question in Check-ins and keeps photos of its patients and of the new rooms in two Docs & Files grids. Every fix found on a walk-through moves across Boards until it is signed off, the work is four lists in To-dos on the progress chart, and the Message Board holds decisions like rope recovery and the news from the site.

In this project

The tools on the project's page, in the order shown above, and what each one holds.

  • Check-ins

    Asks “What's left in your part of the suite?”

  • Docs & FilesHospital barn

    9 pictures

  • BoardsWalk-through

    15 cards in Triage, Logged, Builder fixing, Ready to recheck and Done

  • To-dos

    4 lists, 12 of 26 to-dos done: Before the first surgery, Surgery room, Induction and recovery and 1 more

  • Message Board

    6 posts, the newest “A mock run before the first surgery”

  • Docs & FilesThe new suite

    9 pictures

Start your own project

Create an account and start a project. Every project comes with a Message Board, To-dos, Docs & Files, a Calendar, Boards and Chat, on every plan, Free included.

Try Thicket Free

Free plan or a 30-day Pro trial. No card required.

See all example projects