Getting a surf school ready for its kids' camps
Before the first morning of a surf camp, the school needs wetsuits that fit, instructors with current lifeguard certificates and a plan for days without waves. This project holds camp, gear and staff lists, flat-day plans on a board, try-it morning photos and the daily wave reports.

Breakwall Surf School reports the waves each morning in Chat and posts camp sizes, the lifeguard retest and news from the beach on the . Staff, camp weeks and gear are three lists in To-dos on the progress chart, the Calendar holds the retest, parents' night and each camp week, plans for days without waves move across Boards, and the photos from the try-it morning are in Docs & Files.
In this project
The tools on the project's page, in the order shown above, and what each one holds.
Chat
6 lines from 4 people
5 posts, the newest “Try-it morning: 41 kids”
To-dos
Staff (3 of 6 done), Camp weeks (3 of 6 done) and Gear (4 of 7 done)
Calendar
7 events, the next “Wetsuits arrive: 24 youth suits”
BoardsFlat days
12 cards in Triage, To ask, Waiting to hear, Planned and Done
Docs & FilesTry-it morning
9 pictures
More in Outdoors and sport

Avalanche safety courses
An avalanche course needs enough students, two instructors and terrain the snowpack allows on the day, and each of those can change within a week. This project holds course dates and rosters, field day photos, snowpack notes and each guide's plan for the next day.

Group camping trip
A camping trip for several families means booking a site, planning every meal and deciding who brings each piece of shared gear. Here the trip is one project: the bookings, a board of shared gear, lists for food and the night sky, the calendar and site photos.

Climbing gym expansion
A climbing gym that adds a room builds it beside members still climbing, and the room must pass inspection before it opens. This project holds each order on a board, photos of the build and the light-up climbing board, three to-do lists and the opening dates.
Start your own project