A new trail is built by a small crew and volunteers, on ground that can turn out softer or rockier than the survey showed. Here a boardwalk is one project: the feet built each day, the crew's chat, progress photos, four build lists and the opening date.

Tamworth County Parks plans the Spruce Hollow boardwalk on the and splits the deep piers, the viewing deck, the finished sections and the opening into four lists in To-dos. Progress photos sit in Docs & Files, the roll test, the county board's vote and the opening walk are on the Calendar, the crew talks through each day in Chat, and Check-ins asks every afternoon how many feet went in.
In this project
The tools on the project's page, in the order shown above, and what each one holds.
5 posts, the newest “Can the corps crew stay two more weeks?”
To-dos
4 lists, 9 of 27 to-dos done: Deep piers: sections 27 to 34, Viewing deck and sections 35 to 45, Sections 1 to 26 and 46 to 49 and 1 more
Docs & FilesBoardwalk progress
9 pictures
Calendar
7 events, the next “Roll test, sections 13 to 26”
ChatCrew chat
6 lines from 5 people
Check-insEnd of day
Asks “How many feet of boardwalk went in today?”
More in Outdoors and sport

Avalanche safety courses
An avalanche course needs enough students, two instructors and terrain the snowpack allows on the day, and each of those can change within a week. This project holds course dates and rosters, field day photos, snowpack notes and each guide's plan for the next day.

Group camping trip
A camping trip for several families means booking a site, planning every meal and deciding who brings each piece of shared gear. Here the trip is one project: the bookings, a board of shared gear, lists for food and the night sky, the calendar and site photos.

Climbing gym expansion
A climbing gym that adds a room builds it beside members still climbing, and the room must pass inspection before it opens. This project holds each order on a board, photos of the build and the light-up climbing board, three to-do lists and the opening dates.
Start your own project
Create an account and start a project. Every project comes with a Message Board, To-dos, Docs & Files, a Calendar, Boards and Chat, on every plan, Free included.