Food and drink
Turning an old building into an indoor farm
An indoor farm has to be built, planted and selling at the same time, and one late delivery can hold up all three. This project holds the build-out board, the harvest, food safety and customer lists, photos of the racks and first cuts, and the delivery dates.

Spenard Greens, an indoor farm in a former Anchorage bowling alley, keeps photos of its racks on the old lanes and of its first cuts in two Docs & Files grids, and its first harvest, food safety and first customers as three lists in To-dos. The trial results, the sign-ups and the seed news go on the , the work on the building moves from Next to Done on Boards, and the inspections, the chef tasting and the first deliveries are on the Calendar.
In this project
The tools on the project's page, in the order shown above, and what each one holds.
Docs & FilesOn the lanes
9 pictures
To-dos
First harvest (4 of 8 done), Food safety (3 of 7 done) and Customers (2 of 7 done)
5 posts, the newest “The sunflower seed failed its germination test”
BoardsBuild-out
13 cards in Triage, Next, In progress, Inspection and Done
Calendar
7 events, the next “Electrical inspection: racks 13 to 24”
Docs & FilesFirst cuts
9 pictures
More in Food and drink

Restaurant opening
A restaurant can't open until the kitchen passes its inspections, the menu is settled and the staff have practiced service. This project holds the bowl tests, photos of the room, fit-out fixes by trade, the opening to-dos and the dates up to the first night.

Café menu launch
A new menu means recipes to test and price, equipment to pass inspection and staff to train before the first customer orders. This project holds the plate tests, each dish on a board from testing to training, the launch to-dos and photos of the practice mornings.

Cider harvest
At harvest each variety ripens on its own schedule, and its fruit must be pressed while it is ready. This project holds each batch of fruit on a board from tree to tank, photos of the orchard and press days, the cellar notes and the crew's chat.
Start your own project
Create an account and start a project. Every project comes with a Message Board, To-dos, Docs & Files, a Calendar, Boards and Chat, on every plan, Free included.