Food and drink

Harvesting grapes for sparkling wine

At harvest each block is picked the day its grapes are ready, and a rain forecast can move that day. This project holds each block on a board from sampling to tank, the pick calendar, photos of the rows and the press house, and three to-do lists.

The Base Wine Harvest project in Thicket over a photograph of vineyard rows running down to a wide lake: the health flag reading At risk, the project dates, six people and two links, then six cards: In the rows as nine photographs of the Chardonnay and Pinot Noir picking, the Calendar with tomorrow's Pinot Noir pick next, the Blocks board with cards in Sampling, Pick called, Pressed and settling, and Fermenting, the Message Board with the rain forecast on top, To-dos with three lists on the progress chart, and Press house as nine photographs of whole clusters going into the press and juice running to the tanks.

Vanderploeg Cellars keeps photos of the picking in one Docs & Files grid and of the press house in another. The Calendar holds each pick, and every block moves from sampling to tank on Boards. Rain and ripeness news goes on the Message Board, and the picking, the cellar and the club release are three lists in To-dos.

In this project

The tools on the project's page, in the order shown above, and what each one holds.

  • Docs & FilesIn the rows

    9 pictures

  • Calendar

    6 events, the next “Pick: block 5 Pinot Noir”

  • BoardsBlocks

    12 cards in Triage, Sampling, Pick called, Pressed and settling, Fermenting and Done

  • Message Board

    5 posts, the newest “Rain in three days”

  • To-dos

    Club release (2 of 7 done), Picking (5 of 11 done) and Press house and cellar (4 of 9 done)

  • Docs & FilesPress house

    9 pictures

Start your own project

Create an account and start a project. Every project comes with a Message Board, To-dos, Docs & Files, a Calendar, Boards and Chat, on every plan, Free included.

Try Thicket Free

Free plan or a 30-day Pro trial. No card required.

See all example projects