Building a video game's first playable demo
A game needs art, code, sound and design from several people, and all of it has to work in one build that players can test. Here the project holds the demo's scope, a board of bugs and art, playtest results and the team's chat about each new build.

Oarlock Games keeps photos of a hand-built boat model and a river reference trip in two Docs & Files grids and posts the demo's scope and each playtest's results on the . Every bug, building and sound for the festival demo moves across Boards, To-dos track the build, the booth and the store page, and the team talks about each new build in Chat.
In this project
The tools on the project's page, in the order shown above, and what each one holds.
Docs & FilesBoat models
9 pictures
5 posts, the newest “The rapids drop to 41 fps in the rain”
BoardsFestival demo
18 cards in Triage, Art, Code, Audio, QA and Done
To-dos
Festival build (3 of 9 done), Booth (1 of 6 done) and Store page (3 of 5 done)
Chat
7 lines from 7 people
Docs & FilesRiver trip
9 pictures
More in Products and software

Product launch
A product launch has one fixed date and a long list of work that must be finished before it. Here the whole launch is one project: the photography, the packaging, the store orders and the launch-week to-dos, each showing what is done and what is still open.

Software relaunch
A relaunch puts new features, open bugs and a release date in front of one team at the same time. This project holds the weekly updates, four build lists on the progress chart, a bug board, the specs and photos from a field test.

New product line
A new product line has to be tested, made in quantity and priced, often while the first orders arrive. This project holds the seasoning tests, workshop photos, the first restaurant order, the launch to-dos and the dates for delivery and sale day.
Start your own project
Create an account and start a project. Every project comes with a Message Board, To-dos, Docs & Files, a Calendar, Boards and Chat, on every plan, Free included.