A magazine issue has a fixed date at the printer, and every piece must be written, edited, checked and laid out before it. This project holds every piece on a board from drafting to layout, the cover shoot's photos, the page proofs, the to-dos and the flatplan.

Lintel posts each decision about issue 22 on the and moves every piece from drafting to editing, fact check and layout on Boards. Photos from the cover shoot and the page proofs sit in two Docs & Files grids, the manuscripts and the flatplan in a third, and the words, the pictures and the printer are three lists in To-dos on the progress chart.
In this project
The tools on the project's page, in the order shown above, and what each one holds.
6 posts, the newest “Flatplan 6 is up”
BoardsPieces
14 cards in Pitches, Drafting, Editing, Fact check, In layout and Done
Docs & FilesLinden Court
9 pictures
To-dos
Words (3 of 8 done), Pictures (4 of 7 done) and Printer and mail (2 of 7 done)
Docs & FilesProofs
9 pictures
Docs & FilesIssue files
House style, Manuscripts (4 items), Contributor fees, issue 22, printer-specs-issue-22.pdf, Floor plans (2 items), Fact-check log: Forty households and 2 more
More in Marketing and creative work

Design agency client work
Client work moves in rounds: the studio shows a draft, the client asks for changes, and the next round starts from what was approved. Here one client's job is one project: the client's notes, a to-do list per film, the approved cuts and photos of the sets.

Marketing campaign
A campaign needs its photos, its store displays, its printed pieces and the product itself ready on the same day. Here the campaign is one project: the shoot photos, the display artwork on a board, to-do lists for bottling and launch week, and the print files.

Brand identity refresh
A brand refresh puts one new design on a sign, bags, shelf tags and a website, each with its own maker's proofs. Here the refresh is one project: artwork moving through review on a board, sample photos, suppliers' news, and to-do lists for each piece.
Start your own project
Create an account and start a project. Every project comes with a Message Board, To-dos, Docs & Files, a Calendar, Boards and Chat, on every plan, Free included.