Outdoors and sport
Surveying whales from a small research boat
A survey at sea depends on the weather and the boat, and each day on the water brings back hundreds of photos to sort. This project holds the survey log, each day's fluke photos on a board, photos from the boat, four to-do lists and the calendar.

Kupreanof Whale Research posts the survey plan, its best encounters and the engine news on a called Survey log, and moves each day's fluke photos from sorting to matched on Boards. Fluke photos and pictures from the boat sit in two Docs & Files grids, To-dos splits the boat, photo-ID, drone flights and permits into four lists on the progress chart, and the Calendar holds the part's arrival on the ferry, the sea trial and the last survey day.
In this project
The tools on the project's page, in the order shown above, and what each one holds.
Survey log
5 posts, the newest “The port engine is out”
To-dos
4 lists, 10 of 22 to-dos done: Boat and engine, Photo-ID, Drone flights and 1 more
Docs & FilesFlukes
9 pictures
BoardsPhoto-ID
13 cards in Triage, Sorting, Matching, Second check and Done
Docs & FilesOn the water
9 pictures
Calendar
8 events, the next “Lower unit arrives on the ferry”
More in Outdoors and sport

Avalanche safety courses
An avalanche course needs enough students, two instructors and terrain the snowpack allows on the day, and each of those can change within a week. This project holds course dates and rosters, field day photos, snowpack notes and each guide's plan for the next day.

Group camping trip
A camping trip for several families means booking a site, planning every meal and deciding who brings each piece of shared gear. Here the trip is one project: the bookings, a board of shared gear, lists for food and the night sky, the calendar and site photos.

Climbing gym expansion
A climbing gym that adds a room builds it beside members still climbing, and the room must pass inspection before it opens. This project holds each order on a board, photos of the build and the light-up climbing board, three to-do lists and the opening dates.
Start your own project
Create an account and start a project. Every project comes with a Message Board, To-dos, Docs & Files, a Calendar, Boards and Chat, on every plan, Free included.