Getting a small satellite ready to launch

A small satellite has to pass its tests, get its radio license and reach the launch provider by a fixed date. This project holds the test campaign on a board, clean room and field photos, four to-do lists, the provider's letters and a weekly check-in.

The Loess-1 Launch project in Thicket over a photograph of rolling farm hills at dusk under the first stars: the health flag reading At risk, the project's dates and five people, then nine cards: the Message Board with the pending radio license on top, To-dos with four lists on the progress chart, the Test campaign board with cards in Planned, Running, Data review and Retest, Clean room as nine photographs of the satellite on the bench and in its tests, Chat with the morning's test readings, Ground truth as nine photographs of soil moisture stations on wheat farms, the Calendar with the antenna retest and the fit check, Launch provider with Sextant's letter, the shipping plan and the battery form, and Check-ins with the week's answers, then External links to the procedures, the mass and power budget and the pass sheet.

The Small Satellite Lab at Loess Hills State University moves each test of Loess-1 from planned to done on Boards, keeps the flight unit, the ground station, the licenses and shipping as four lists in To-dos and posts each result on the Message Board. Photos of the satellite in the clean room and of the soil moisture stations on six farms sit in two Docs & Files grids, beside a third that holds the launch provider's letters and forms. The morning's test readings go in Chat, the Calendar holds the antenna retest, the fit check and ship day, and Check-ins asks everyone each week what they finished.

In this project

The tools on the project's page, in the order shown above, and what each one holds.

  • Message Board

    5 posts, the newest “Our FCC license is still pending”

  • To-dos

    4 lists, 11 of 24 to-dos done: Licenses, Shipping and integration, Ground station and 1 more

  • BoardsTest campaign

    16 cards in Triage, Planned, Running, Data review, Retest and Done

  • Docs & FilesClean room

    9 pictures

  • Chat

    6 lines from 5 people

  • Docs & FilesGround truth

    9 pictures

  • Calendar

    7 events, the next “Antenna deploy retest at minus 20 °C”

  • Docs & FilesLaunch provider

    sextant-interface-control-rev-f.pdf, Sextant's letter: delivery date and fit check, Sextant's requirements on one page, Test reports (3 items), loess-1-battery-hazard-form.pdf, Shipping plan and 1 more

  • Check-ins

    Asks “What did you finish on Loess-1 this week?”

Start your own project

Create an account and start a project. Every project comes with a Message Board, To-dos, Docs & Files, a Calendar, Boards and Chat, on every plan, Free included.

Try Thicket Free

Free plan or a 30-day Pro trial. No card required.

See all example projects